Call Us Now: 
763-434-3244
Tap Here to Call Us Now: 763-434-3244
About
Services
Waterproofing
Air / Vapor Barrier
Service Repair
Blog
Contact Us
Call Us Now
Quality Assurance Form
Date
*
Did you double check the date?
Date Format: MM slash DD slash YYYY
Project
*
Your Name
*
Brad B
Hunter B
Dave C
Shane C
Jake D
Ben F
Cory F
Nick F
Arista G
Art H
Tim S
Tommy S
Dee S
Eric S
Jordan S
Elliot W
Cole W
System(s) Being Installed
*
Check all that apply.
Bentonite
Hot Fluid-Applied WP
Cold Fluid-Applied WP
Spray-Applied WP
Sheet Membrane WP
Sheet Membrane AB
Spray-Applied AB
Traffic Coating
Other
If other, please write system(s) being installed in box below.
Is the substrate acceptable?
*
Yes
No
If no, have you notified the GC?
Yes
No
I'm afraid to talk to grown ups..
Substrate Photo
Please upload a photo of the substrate. Up to 10 photos/videos.
Drop files here or
Accepted file types: jpg, gif, png, pdf, heic, mov.
Material Check
*
Check all that apply.
Materials are in acceptable condition for install.
I have enough materials to cover today's work.
Weather Check
*
Check all that apply.
I have checked weather conditions for the day.
I understand the temp restrictions regarding my material.
I have a plan for incoming weather.
Safety Check
*
Check all that apply.
I and my crew have all the proper PPE.
I have all necessary safety equipment onsite and in place.
I am aware of the nearest hospital to the site.
I have made a point to discuss potential risks involved with today's work with my co-workers.
What are two potential risks involving today's work?
*
(people working overhead, working in a lift, working off a ladder, job site terrain, ect.)
Do you have the necessary equipment onsite for today's installation?
*
Yes, I am confident in my selected equipment.
No, I am displeased with the equipment choice.
What equipment? I have none..
Any notes on equipment?
(condition, future or current equipment needs, ect.)
Have you reviewed project specific details and product specific install procedures with your crew?
*
Yes
No
What details/install procedures?
Goal For The Day
Area of work, detailing coverage.
What is your daily production goal for this job?
*
(SF/Day)
Comments/Concerns
Additional Photos?
Feel free to upload photos/videos here. Who know's, it could change history.
Drop files here or
Accepted file types: jpg, gif, png, pdf, mov, heic.
Comments
This field is for validation purposes and should be left unchanged.
About
Services
▼
Waterproofing
Air / Vapor Barrier
Service Repair
Blog
Contact Us
Call Us Now